Modular Tank Installation Project
Description
Scope:
• Mechanical, Piping and Steel works
• Mechanical Piping, and Tank Installation. End to End Scaffold Erection Work Scope under SLE.
• Piping Volume 10K dia inches. Fast Tracked Project with short turnaround time.
Duration
7 Months
Location
Mainland Singapore
![](https://static.wixstatic.com/media/4dbe89_2f8bef4604d94eb7a65bad3ac8218fd8~mv2.jpg/v1/fill/w_768,h_1024,al_c,q_85,enc_auto/4dbe89_2f8bef4604d94eb7a65bad3ac8218fd8~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_a414fd76224540d691b4707191165d54~mv2.jpg/v1/fill/w_720,h_540,al_c,q_85,enc_auto/4dbe89_a414fd76224540d691b4707191165d54~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_b67fb01ceb274e808c1248f817057327~mv2.jpg/v1/fill/w_768,h_1024,al_c,q_85,enc_auto/4dbe89_b67fb01ceb274e808c1248f817057327~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_2f8bef4604d94eb7a65bad3ac8218fd8~mv2.jpg/v1/fill/w_768,h_1024,al_c,q_85,enc_auto/4dbe89_2f8bef4604d94eb7a65bad3ac8218fd8~mv2.jpg)
1/3
bottom of page