top of page
Duration
Duration
Modular Tank Installation Project
Description
Scope:
• Mechanical, Piping and Steel works
• Mechanical Piping, and Tank Installation. End to End Scaffold Erection Work Scope under SLE.
• Piping Volume 10K dia inches. Fast Tracked Project with short turnaround time.
Duration
7 Months
Location
Mainland Singapore
1/3
bottom of page