top of page
Duration
Duration
SCPU T/A Flare Tip Replacement
Description
Scope:
• Removal of existing flare tip: Removal of a 21-ton flare tip.
• Installation of new flare tip: 18-ton flare tip at a height of 150 meters.
• Crane used: Utilized an 800-ton crawler crane for the installation.
• Support crew was deployed to perform flange policing.
Duration
1 Month
Location
Jurong Island
![](https://static.wixstatic.com/media/4dbe89_8ac64bc7d6df46329d16e02999229799~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/4dbe89_8ac64bc7d6df46329d16e02999229799~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_cc55d15c9813466093c35dc6e2c33598~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/4dbe89_cc55d15c9813466093c35dc6e2c33598~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_e3b2fcede9944c81ade32abbd9dc5c82~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/4dbe89_e3b2fcede9944c81ade32abbd9dc5c82~mv2.jpg)
![](https://static.wixstatic.com/media/4dbe89_8ac64bc7d6df46329d16e02999229799~mv2.jpg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/4dbe89_8ac64bc7d6df46329d16e02999229799~mv2.jpg)
1/4
bottom of page