SCPU T/A Flare Tip Replacement

Description

Scope:
• Removal of existing flare tip: Removal of a 21-ton flare tip.
• Installation of new flare tip: 18-ton flare tip at a height of 150 meters.
• Crane used: Utilized an 800-ton crawler crane for the installation.
• Support crew was deployed to perform flange policing.

Duration

1 Month

Location

Jurong Island