Jurong Shutdown

Description

Scope:
• Removal of existing ducting using heavy lifting equipment (300-ton crane)
• Installation of new ducting
• A peak workforce of approximately 150 personnel
• An estimated total of 30,000 man-hours

Duration

1 Month

Location

Jurong Island